Ecofrost Péronne: a complete 120 t/h potato reception line

A greenfield plant, a complete reception line

For its new potato processing plant in Péronne (France), Ecofrost asked Spinnekop to engineer the complete reception line: everything between the truck arriving at the site and the potatoes going into storage. The line handles 120 tonnes of potatoes per hour.

What we delivered

The reception line brings together the full range of Spinnekop equipment for receiving and preparing potatoes:

  • Reception hoppers with desoilers

  • Sample takers

  • Washing line

  • Destoner

  • Flotation bath

  • Sorters

  • Stocking silos

The full Spinnekop process

As a greenfield project, the line could be designed around the ideal product flow from the very start. We followed the complete Spinnekop process: from analysing the requirements and engineering the layout, to building the machines, installing them on site and commissioning the line.

The result

A complete reception line running at 120 tonnes per hour, and a client who is very happy with the result.